The 25mm thick significant steel tube is pushed Together with the conclude closed by a metal shoe. On reaching the necessary driving resistance, a complete length cage is decreased in for the tube and stuffed with superior slump concrete. The tube is then vibrated out leaving a shaft of concrete.The withdrawn tube is fitted using a Distinctive flat